Hope Water & Light 105 N. Elm St. P.O. Box 2020 Hope, AR 71801-2020 (870)-777-3000 |
|
Large Power
AVAILABILITY: This
schedule is available in all territory served by HWL for Large Power Service
customers. TYPE
OF SERVICE: Alternating
current, sixty-hertz, three phase, secondary or primary voltage service or
at such higher voltages as HWL may make available at the point of delivery.
HWL reserves the right of final determination of voltage and phase of
service. POINT
OF DELIVERY: Service
to a single contiguous property will normally be provided at one point of
delivery and through one meter; provided however, that at the option of HWL, service may be provided at more than one point of delivery on
contiguous property in which event, each point of delivery will be considered a
separate account and will be metered and charged separately. APPLICABLE
TO:
NET
MONTHLY RATE
Customer Charge: $500.00 per month
Energy
Charge: May
thru September Billing Cycle: 3.35¢ per kilowatt-hour
October thru April Billing Cycle:
2.40¢ per kilowatt-hour
Demand
Charge:
Secondary
Service May
thru September Billing Cycle: $6.10 per kilowatt of Billing Demand
in the month, but not less than $21,350.00[1]. October
thru April Billing Cycle: $4.95 per
kilowatt of Billing Demand in the month, but not less
than $17,325.00[1]. Primary
Service May
thru September Billing Cycle: $5.60
per kilowatt of Billing Demand in the month, but not less
than $19,600.00[1]. October thru April Billing Cycle: $4.50 per kilowatt of Billing Demand in the month, but not less than $15,750.00[1].
[1] Minimum Monthly Billing Demand Charges at 70% of 5,000 kW. Minimum monthly billing demand charge subject to billing demand clause of this rate schedule.
BILLING
DEMAND: The
kilowatts of billing demand for each month will be the average kilowatt load
created by the Customer during the 15 minute period of maximum use during the
month. The minimum demand billing
shall be the greater of 70% of the highest kilowatts of billing demand
established during the 11 (eleven) preceding months or 3,500 kW (70% of 5,000
kW). The kilowatts of billing
demand will be subject to the Power Factor Adjustment Clause. POWER
FACTOR ADJUSTMENT: HWL
reserves the right to determine the power factor of the Customer's installation
served hereunder. Should the
power factor at the time of establishment of any 15 minute period of
maximum use during the month be determined to be below 90%, the Customer's
Kilowatts of Billing Demand will be adjusted by multiplying the Kilowatts of
Billing Demand by 90% and dividing the result by the actual power factor at the
time of maximum use. CAPACITY
CHARGE FOR HIGHLY FLUCTUATING LOADS: Should
the Customer operate equipment with highly fluctuating, intermittent, or
abnormal characteristics that make it necessary for HWL to install any
additional distribution facilities to serve the Customer or to prevent
disturbances to the service of other customers, an additional charge of $1.00
per month per kilovolt ampere (KVA) or fraction thereof transformer capacity
installed by HWL to serve the Customer will be added to the Customer's bill. PRIMARY
DISCOUNT: Upon
the request of the Customer, there will be a discount of 2.2 percent of the
kilowatt hour charge on all monthly bills if electric service is provided at
HWL's primary distribution voltage of 13.8 KV or higher and the Customer
furnishes and maintains all necessary transformation equipment beyond this
point. FACILITIES
CHARGE:
POWER
COST ADJUSTMENT: In
addition to all other charges, the amount of the Customer's bill will be
increased or decreased by an amount per kilowatt hour calculated according to
the formula in the Power Cost Adjustment (PCA) - Rider.
TERMS
OF PAYMENT: Customers
who pay within 10 days of the date of the bill will pay the CURRENT BILL
computed on the Net Monthly Rate. Bills
paid after 10 days from the date of the bill will include a late payment charge
of ten percent (10%) of the first $30 plus two percent (2%) of the amount over
$30. TERMS
AND CONDITIONS:
|
[ Check
Your Bill ] [ Community Links
] [ Local Weather ]
[
Map Index ] [ Rates ]
[ Call Before Digging
] [ Customer Service ] [
The Water Wizard Page ]
[ HWL Photo Gallery ]